Pipelines

Dof Subsea

Flexible Riser & Umbilical Installation (2013 / 2014)

Provision of PRDS and associated engineering to complete installation of flexible products in line with the DOF/TEEKAY Banff & Kyle re-instatement project. The project was delivered in two phases from different vessels and required different tensioner units and configurations for the riser and umbilical installation.

Centrica Energy

Zap-Lok Pipeline Study (2013 / 2014)

The purpose of this study was to provide Centrica Energy Upstream (CEU) with a commercial, technical and operational analysis of offshore pipelay using the Zap-lok pipe connection system, based on a Cortez Subsea, Modular Pipelay System (MPS) to allow a comparison with conventional reeled pipelay in the UKCS.

Inspection & Intervention

Micoperi

Ghana Gas Export Line Sinopec/Ghana Gas (October 2013 - April 2014)

Provision of ROV to perform pipeline inspection and remedial work on the 12” export pipeline from 800m w.d to shore.

Micoperi

Subsea Well Abandonment Lundin Petroleum (September 2012 - December 2012)

Provision of project management, engineering and technical supervision and intervention equipment to support the abandonment and recovery of two subsea wells and trees offshore Tunisia.

Repsol

Montanazo & Lubina Field Development (July 2012 - December 2012)

Provision of project management, technical supervision and intervention equipment to support the subsea installation and tie-back of the Montanazo and Lubina wells to the Casablanca Platform on behalf of Repsol.