

Details
- Project Date 01 Sep 2016
- Location Gabon
- Client/Operator Bourbon Subsea/Total Gabon
- Category Pipeline
Description
The scope of work at the Total Torpille sector, located 50km south of Port Gentil, Gabon, included the installation of a 6-inch water injection pipeline between TRMPFK and HYMPFC Platforms (approx. 25.2 km) and the associated risers and subsea connecting spools at each platform. We used our Modular Pipelay System (MPS™) to install the pipeline utilising Zap-Lok™ mechanical connectors as well as associated pipeline installation equipment, aids and personnel.