

Details
- Project Date 01 May 2016
- Location Poland
- Client/Operator Lotos Petrobaltic B8 SPV
- Category Pipeline
Description
As part of developing the B8 Field a gas coiled tubing pipeline (CTP), with an outside diameter of 4.5-inch, was installed to connect the offshore production centre and onshore heat-plant. The pipeline transports natural gas from the B8 field platform to the Energobaltic CHP Plant in Wladyslawowo in a 80km pipe. Cortez Subsea performed the pipeline installation engineering, supplied installation equipment and personnel and supervised the pipeline installation operation from the client supplied vessel.